case study

The Story of the Birth of E One

09 Dec, 2022

author avatar
The Story of the Birth of E One

A company well-known for superior analytical instruments and laboratory equipment opted for RPWORLD to produce 100 units assembly parts of a Spectrometer per order, the total demand is 400 sets per year.

Project Background

A company well-known for superior analytical instruments and laboratory equipment opted for RPWORLD to produce 100 units assembly parts of a Spectrometer per order, the total demand is 400 sets per year. 

Challenges

  • How to select the most suitable manufacturing processes to meet the customer’s requirements? 
  • How to achieve the good surface effect and mechanical perfor mance for the products? 
  • How to guarantee high quality and meet client’s tight deadline? 

RPWORLD Solutions

Processes Chosen

• After meticulous analysis and discussion, we chose vacuum casting combined with over-molding process, for the metal parts, we use CNC machining and sheet metal process.
• Internal copper painting for EMC.

Material Choice


• ABS performance Polyurethane Resin, PC,TPE
• Rubber to be over-molded
• Stainless steel, aluminum 

Project Schedule 

• Rapid prototyping and testing7 days
• Silicon mold manufacturing and testing3 days
• 100 units replication by urethane casting15 days
• After-treatment by specialist5 days
• Total30 days

Customer Benefits 

Testimonials

The characteristics of RPWORLD are good quality, delivery on time, good technical knowledge of employees and fair prices. So RPWORLD became our preferred supplier for our new product development projects.